工厂英文自我评价怎么写
工厂英文自我评价怎么写呢?我们一起来看一看
1、工厂英文自我评价是开头部分,可以写工厂员工的工作内容及工作职责;2、接着可以对自己的工作进行一个,包括工作态度、工作表现、获得的荣誉等;3、结尾部分写对自己的评价和今后努力的方向。
工厂英文自我评价篇一
I ork, has been engaged in a line of electrical ork, over the years, I have strict demands on themselves, ork conscientiously. Mainly from the folloing aspects to sum up:
First, the ideological and political learning and democratic management
I earnestly studied Marxism-Leninism, Mao Zedong Thought and Deng Xiaoping Theory, and guided the production practice in the spirit of the three represents.
Actively participate in all kinds of democratic activities, participate in democratic management, ork hard at home, ork ell, and do a good job as a production frontline electrician.
Second, the safety aspects
1, implement the spirit of the higher documents to improve the safety aareness of orkers, enhance the sense of responsibility of orkers.
2, to implement and improve the safe use of electricity anizational system, improve safety management rules and regulations.
3, to strengthen safety management team to consolidate the security base.
4, one to ensure that electricity consumers to ensure their on safety and security of others.
Third, training and learning
Over the years, I actively participate in various learning and training, and strive to learn the basic knoledge of electrician knoledge, poer supply system knoledge, line devices, lighting devices, grounding devices, transformer operation and maintenance, motor repair and maintenance, electrical control circuit, PLC Control and other related knoledge system. Every time I learn, I have learned some ne theories, and used to guide the ork practice, applied to the ork, to the factory poer supply system, the control system improvement, receives the consistent high praise.
Fourth, in terms of energy saving
In energy saving, I actively use the knoledge has been learned for the factory to do a lot of energy saving aspects of the contribution. Such as the transformation of the factory line, the annual energy saving for the factory more than ten million degrees. While the old factory equipment, electrical transformation, so that some of the old equipment to rejuvenate.
Fifth, the practice of production
In the production practice, for example: motor electrical fault detection and troubleshooting examples. Electrical: 1, check the lead ire insulation is intact, the motor is overheated, check hether the iring meets the nameplate requirements, inding and the first, the end of poer is correct; 2, measuring insulation resistance and DC resistance test insulation is damaged. 3, poer on the check after the end of the problem found, you can directly poer test ith a three-phase voltage regulator began to impose a loer voltage, and then gradually increased to the rated voltage, etc .. 3, poer-on check hether there is no open circuit, short circuit and grounding; . Use the above inspection method, for the factory more than one motor to find fault, and fix it. Timely summary of various symptoms and solutions, and documented, to guide the practice, but also improve their business level. In short, the production practice in the rules and regulations on the all, in strict aordance ith the rules and regulations. Over the years, the factory did not our ith a life-related electrical safety problems, and the factory through a number of technical transformation, equipment operation more scientific and rationalized.
工厂英文自我评价篇二
Since the beginning of my career, I have been constantly strengthening my self-cultivation, striving to improve the ideological and moral level, earnestly carry out the deepening of the cultural and professional knoledge, continue to explore ne knoledge, fe ahead, and actively carry out intelligent range The ork, the plete performance of a electrician's ork responsibilities, from a good example to take the lead role. And actively participate in technological exchanges and technological innovation activities, the earth to do a good job, help, ith the role, and fully pleted the tasks assigned to the higher levels and targets in the pany's production and development play its due role.No I have been orking since the professional and technical ork are summarized as follos:
First, consciously strengthen theoretical study, and strive to improve personal qualities
Without a firm and true political orientation, there ill be no positive guiding ideology. In order to continuously improve their political and ideological quality, the past fe years I have been very concerned about national affairs, concerned about the situation at home and abroad, bined ith the impact of changes in the situation of enterprises to analyze and put this idea into practical action to the production process to ensure In their thinking and action has alays been consistent ith the party and enterprise. At the same time, this idea into the ork and study, the constant pursuit of their on progress. In order to be suessful, a person's career must first learn ho to behave! Especially in our highly technical ork, to see things carefully, do things to concentrate on, to learn to be modest. Can not have the slightest sloppy and error. All the first ork attitude to correct, have a good professional quality, ork to be serious and responsible, subject to leadership arrangements, open to others to listen to advice and advice, to unite colleagues, courtesy, arm service.
Second, correct ork attitude, play a leading role
I fully understand the importance of mechanical and electrical management during the construction period. In particular, it contains most of the invisible electrical infrastructure and engineering. It is necessary to supervise and inspect the problems at any time. We must solve the problems and never hastily. Otherise, Eradication, hich e place mechanical and electrical management in front of a test and responsibility. As an electrician, the responsibility and the burden of my duty. Therefore, in the usual ork, I made myself some of the strict requirements: one in the face of dirty tired and bitter at ork to grab the front of the orkers dry, and more than the orkers do the next; In the face of technical problems is to e forard and do their best to overe technical difficulties; I alays adhere to do my best to do everything to the interests of the pany. Third, I asked myself to be responsible; I think that since he is an electrician, then the level of business and many other aspects of the general orkers should be stronger than some. In the pany assigned tasks, the general orkers to plete the more difficult tasks, they should take the initiative to take on more, but not ith the orkers buck-passing, to make the teacher ho demeanor, Yong burden. I usually not only ask their on, in practice, I also do aording to these requirements.
Third, strengthen business learning, improve the technical level
Science and technology continue to develop today, one day do not learn to be backard. In particular, this piece of electrical automation, no one hundred percent of all proficient in finished, so I usually have time to look at professional books. Over the past year, I have collected a large number of ne professional books, constantly enrich themselves, continue to grasp the ne knoledge. Such as "electrical design draing", "electronic technology", "modern frequency technology", "DC in industrial applications" and so on, in the process of learning this knoledge, I learned a lot of ne knoledge, such as: PLC programming control Principle, ABB inverter settings and control principles, SIPMOS high-poer to-ay SCR control principle, and so I really benefit! Not only broadened my knoledge, is still largely improved my technical level, But also I have a higher level of theoretical and technical knoledge of the study had a keen interest.
Fourth, the development of skills to each other to achieve social services
In the usual ork, I often carry out technical discussions and exchanges ith other orkers, to share their knoledge and share ith others, and learn from others ho do not understand their knoledge and achieve mon progress. I am fully integrated theory and practice, continue to aumulate experience, continue to study ne business, hich makes my skill level to a skilled, use the ease of the point.
To sum up, I feel orthy of the honorable title of electrician! But I, as a technical staff, can not be narcissistic no, but still continue to strengthen their on learning, continue to learn from each other, and only then can keep up ith The pace of the times steady progress, but also be able to better serve the enterprises and serve the munity.
以上就是人工智能机器人网小编今天的分享,希望可以帮助到大家。
机器人培训
- 达芬奇机器人献爱心 将主刀公益手术
- 亚马逊将在英国招聘2000多人 重点开发Alexa和无人
- 美、德、英、日、中5国机器人发展全景大盘点
- 国产机器人窗口期 不可错失制造2025弯道超车机会
- 一个小时,这只机械狗“自学”会了走路!
- 三穗长吉镇:无人机飞防作业 稳粮增豆保丰收
- 依靠静电着陆的新型机器人
- 工业机器人推广应用座谈会
- 在苹果的智能机器人软件公司是一种怎样的体验
- 四大家族之KUKA工业机器人应用案例分析
- 万事俱备只欠东风?机器人产业的东风到底在哪
- 欧洲 6 轮送货机器人开始在美国大学推广
- 芜湖:考核第一!6项冠军!
- 人工智能有望打破医疗资源不均衡
- 立讯精密:已进军新能源汽车市场,目标成为全
- 90后用机器人炒菜周入10万,炒菜机器人真的有可